|
Land Plot of 8.46 ha in Nagatinskaya poima on the Moskva Riv - 0 sqft - $55,000,000
|
Bookmark
Printable
|
|
|
|
|
|
|
|
General Details
|
|
|
|
Reference Number |
Ref-29553654 |
|
|
|
Availability |
Available
|
Type |
land |
|
Location |
Moscow, Russia
|
Price |
$55,000,000 |
|
Last Updated |
6/16/2008 |
Date Available
|
|
|
Street Address |
|
|
|
|
|
Amenities
|
|
|
|
|
|
Features
|
|
|
|
Bathrooms |
0 |
Bedrooms |
0 |
|
Listing Type |
For Sale
|
Parking |
0 |
|
Year Built |
|
Floors |
0 |
|
Basement |
No |
Security |
0 |
|
Maintenance |
0 |
Taxes |
0 |
|
Insurance |
0 |
Down Payment |
0 |
|
|
|
|
Contact Details
|
|
|
|
Alexsandr Kuzmichev
|
Moscow Russia
|
sale@emd-group.com
|
|
|
|
|
|
Property Details
|
The land plot is situated in close proximity to "Kolomenskaya" metro station. Distance to Third Transport Ring ~ 4.5 km. Distance to Andropov avenue ~ 2 km. In the north and west the the land plot is bounded by the old Moskva river bed. Located to the east and south are manufacturing and storage buildings. On the opposite bank of the old Moskva river bed are manufacturing and storage buildings. To the west of the land plot a technological park is being built. To the south of the land plot flow the Moskva river.
Total area – 7 470 sq. m (15 building), used for manufacturing purposes (water-buses repairing, workshops, warehouses, caravan service, etc.) and letting. Form of law - proprietorship Land plot – 8.46 ha Form of law – lease arrangement for 49 years (till 2046)
The territory is used for manufacturing purposes (berthage, water-buses storaging and repairing, workshops, warehouses). The terrain is even, without sudden drops of heights Alongside the land plot there are driveways and devices, which lift the water-buses from the water and move them to the repair or storage area. Part of the metal hangars is let out. Along the bank line there is a berth (being documented into federal property). The territory is fenced According to the results of the town-planning estimations carried out taking into consideration existing restrictions and based on international consulting companies expert opinions, it is suggested that the territory should be developed and a mixed-use complex with overall area of 70 000 sq. m should be built. Addition information http://emd-group.com/eng/8/
|
|
|
|
|